DPR Construction

Download the case study

The Challenge

Monica Chhatwani, LEED AP BD +C for DPR Construction®, was looking for a more efficient QC workflow to capture in-wall conditions before, during, and after wall closures for a large life sciences research building project. Using Takt methodology for scheduling, QC had its own Takt which was a 5-day activity per Takt ‘area’, with each area covering roughly 6000 sq. ft.

The Summary

Using StructionSite for robust documentation with tagged photo timelines really improved communication between all trades on the site as well as removing the waste of needless field visits or information requests to see what was behind the walls.

Make job site capture a differentiator,
not a time-waster.

Empower Your Team and Impress your Clients with StructionSite.

Download the case studyRequest a demo
By using this site or clicking “Accept”, you agree to the storing of cookies on your device to enhance site navigation, analyze site usage, and assist in our marketing efforts. View our Cookie Policy for more information.